Clan repaired and restored large decorative urns from the Wallace Collection.
Project Details
Duration: November 2015 - Feb 2016
Service: Structural Repair
Client: The Wallace Museum London
Contract Sum: XXX
Location: London
Clan repaired and restored large decorative urns from the Wallace Collection.
Duration: November 2015 - Feb 2016
Service: Structural Repair
Client: The Wallace Museum London
Contract Sum: XXX
Location: London
© 2017 Clan Contracting Ltd. All Rights Reserved. Designed by Onhold Studio.